Most factories open at 300 per colourway and call anything smaller a favour. We start at 12 because sublimation has no screen or plate cost — the setup is the same whether you print two colours or twelve.
Below 12 pieces we quote individually rather than refusing the order. The extra cost is real, and we show you where it comes from instead of hiding it in a unit price.
| Hooded sun shirt (hat + mask) | 12 pcs per design · sizes mixed |
|---|---|
| Hooded long sleeve | 12 pcs per design · sizes mixed |
| Long sleeve performance | 12 pcs per design · sizes mixed |
| Club and charter kit | 50 pcs per design · individual names allowed |
| Lead time | ≤200 pcs: 12 working days · ≤500 pcs: 18 working days |
| Custom fabric or Pantone dye | Quoted per fabric — usually a higher minimum than a stock fabric |
| Custom labels and hangtags | Quoted per label type, developed alongside the order |
Any factory that quotes a number without asking these six questions is guessing — and the guess usually changes after the deposit.
Composition and weight. Ice silk polyester and poly-spandex sit at different prices; custom-dyed fabric adds a mill minimum.
A chest logo and a full-body print use very different amounts of ink and press time.
Woven labels, hangtags, zippers and drawcords are small line items that add up per piece.
Cutting in larger lays and booking fabric once per colour lowers the unit price at every step up.
Poly bag and size sticker, or individually bagged and labelled for a marketplace.
FOB, CIF or DDP change the number you see — and who carries the duty.
Not a price list — the mechanics behind one. Ask for the current ladder on your specification and we will send it as a table, not a range.
| 12–49 pcs | Set-up and sampling cost spread across a very small run. One fabric booking. Standard poly bag and size sticker. Best used to test a design in market. |
|---|---|
| 100–299 pcs | Fabric booked per colourway. Trim and label pricing improves. Packaging can be customised without a separate setup. |
| 300–999 pcs | Cut in larger lays, so sewing time per piece drops. Dedicated line time becomes possible for tight dates. |
| 1,000+ pcs | Mill pricing on fabric, planned line capacity, and freight consolidation across colourways. |
Include the fabric you have in mind, or ask us to propose one. Either way the answer comes with numbers.